Online UPS / Critical power

20 kVA Online UPS for Business & Industrial Loads

20 kVA sits within Fujitronix’s ERD–FTX 15–250 kVA three-phase range, subject to final phase, load and battery configuration.

Fujitronix lithium-ion energy storage system
Product familyLithium-ion energy storage
01True online double conversion
02DSP-based control
03IGBT switching
04Pure sine-wave output

Pricing answer

Price follows the electrical scope.

Fujitronix quotes against the required capacity, phase, load behaviour, backup or regulation objective, battery and accessories, installation conditions and project location. A technically comparable quote should state what is included instead of reducing the decision to one headline rate.

Request technical sizing

Lithium-ion energy storage

Fujitronix lithium-ion energy storage systemFujitronix lithium-ion ESS

Key facts

Key facts at a glance.

01

Chemistry

LiFePO4LiFePO4 cells with an integrated battery-management system.
02

Classes

5–30 kWh5, 10, 15, 20 and 30 kWh classes. Confirm the current model with us.
03

Energy source

Grid / solarRelevant configurations can store electricity from the grid or compatible renewable sources.
04

Communication

CAN / RS485Communication and Wi-Fi options depend on the selected battery and inverter configuration.
01

Start with the requirement

Size the 20 kVA system around usable load and runtime.

20 kVA sits within Fujitronix’s ERD–FTX 15–250 kVA three-phase range, subject to final phase, load and battery configuration.

02

How to select

Choose the right system before you choose the rating.

A true online double-conversion UPS keeps the load on a conditioned inverter path, so the selection is fundamentally about power quality as well as backup time. Fujitronix publishes DSP control, IGBT switching, PWM sine-wave output, protection logic and optional communications on its ERD-FTX platform.

  • Connected load and power factor
  • Single- or three-phase input/output
  • Required battery runtime
  • Load inrush and future headroom
  • Bypass / isolation requirements
  • Monitoring such as RS232 or SNMP
03

Commercial selection

What changes the final configuration and quote?

For a 20 kVA quotation, share connected kW/kVA, power factor, input/output phase, battery runtime, load criticality, bypass requirement, SNMP need and installation location.

04

System operation

Segment the load before deciding UPS capacity or redundancy.

Put servers, network, medical, controls and other essential equipment in a clear critical-load schedule. Record measured load where possible, identify equipment with high starting demand and decide what can safely remain outside the UPS. For high-availability sites, also define whether N+1 redundancy, parallel operation, maintenance bypass or remote monitoring is required. This prevents a large but poorly planned UPS from becoming a single point of failure.

05

Lifecycle planning

Battery condition, cooling and bypass planning decide long-term readiness.

UPS batteries age faster in heat and under repeated deep discharge. A practical maintenance plan records alarm history, battery/string readings, charger condition, fans, capacitors, filters, connections, bypass status and load level. Runtime should be rechecked against the present load because business equipment often changes after the UPS is installed.

06

Site planning

Installation planning for 20 kva online ups.

UPS performance depends on the electrical environment around the cabinet as much as the cabinet itself. Input protection, cable sizing, earthing, ventilation, battery location, bypass strategy and service clearance should be reviewed before installation so the commissioned system matches the design intent.

  • Input and output distribution
  • Earthing and protection coordination
  • Battery bank location and ventilation
  • Maintenance / static bypass plan
  • Cooling and service clearances
  • Load test and alarm verification
07

RFQ checklist

What to send before requesting a 20 kva online ups proposal.

Share a load schedule, present and future kW/kVA, phase, target autonomy, battery preference, bypass requirement, monitoring requirement and site city. If the load includes motors, medical devices or process equipment, include the equipment electrical data as well.

08

Fujitronix approach

A useful proposal should answer more than capacity.

Fujitronix combines requirement review, product selection, manufacturing and lifecycle service. For a useful proposal, share the load schedule, phase, backup objective, site conditions and any monitoring, bypass, battery or integration requirement. The quotation should clearly state the recommended system and what is included.

Buyer & engineering checklist

Four decisions that shape the 20 kva online ups proposal.

Clear answers at the enquiry stage reduce incorrect sizing, missing accessories and price comparisons between unlike systems.

01

What is the peak power requirement?

The inverter and battery must meet the highest simultaneous load and any starting surge, measured in kW or kVA.

02

How much energy is required?

Usable kWh is selected from the critical load, target hours, allowed depth of discharge and system losses.

03

Is solar part of the system?

Share PV capacity, MPPT/inverter details and the required grid/solar charging behaviour.

04

Can capacity be expanded later?

Expansion must be planned around compatible modules, BMS limits, inverter capacity and installation space.

Avoid weak specifications

Common mistakes that lead to the wrong quotation.

  1. 01Buying on Ah without checking battery voltage
  2. 02Ignoring BMS continuous and peak current
  3. 03Sizing energy without checking inverter power
  4. 04Assuming every lithium battery communicates with every inverter

Product + manufacturing evidence

A closer look at the system and the people who build it.

The second image shows the Pune manufacturing or power-electronics environment behind the product range.

Fujitronix lithium-ion energy storage system
Fujitronix lithium-ion ESS
Fujitronix India manufacturing floor in Pune
Pune manufacturing unit

Application areas

Where this architecture fits.

Final selection depends on site electrical conditions and the connected load.

01Data centres & server rooms
02Healthcare & laboratories
03CNC / process control
04Banking & financial systems
05Broadcast & ISP infrastructure
06Safety & emergency systems

Technical data

Specification snapshot.

Use this as an evaluation starting point. Final configuration should be confirmed in the technical proposal.

Rating context20 kVA within the 15–250 kVA ERD–FTX range
TechnologyDSP based, IGBT switching
WaveformPWM sine wave
Regulation±1%

Frequently asked questions

Clear answers before you shortlist a system.

Practical answers for purchase teams, consultants, facility managers and business owners planning a serious enquiry.

LiFePO4 energy storage cabinet with inverter and solar electrical integration
Lithium ESS integration · Application-context visual
01What should I check before buying 20 kva online ups?

For a 20 kVA quotation, share connected kW/kVA, power factor, input/output phase, battery runtime, load criticality, bypass requirement, SNMP need and installation location.

02How should an online UPS be sized?

Start with the real connected load, power factor, phase, inrush, redundancy requirement and future growth. Battery runtime is then sized separately against the protected load and duty requirement.

03Is an online UPS different from a normal inverter?

Yes. A true online UPS continuously conditions power through its conversion path and is intended for loads where voltage quality and transfer behaviour are critical. An inverter is generally chosen primarily for outage backup.

04Can Fujitronix customise an online UPS configuration?

Specifications can be customised for specific requirements. Final feasibility is confirmed during technical selection.

05What should I send Fujitronix for a faster 20 kva online ups recommendation?

Share a load schedule, present and future kW/kVA, phase, target autonomy, battery preference, bypass requirement, monitoring requirement and site city. If the load includes motors, medical devices or process equipment, include the equipment electrical data as well.

06Can 20 kva online ups be selected only from price or nominal rating?

Not reliably. For a 20 kVA quotation, share connected kW/kVA, power factor, input/output phase, battery runtime, load criticality, bypass requirement, SNMP need and installation location. A comparable proposal should state the assumed load, topology, included battery or accessories, installation scope and the conditions used for sizing.

07What should be verified during installation or commissioning of 20 kva online ups?

UPS performance depends on the electrical environment around the cabinet as much as the cabinet itself. Input protection, cable sizing, earthing, ventilation, battery location, bypass strategy and service clearance should be reviewed before installation so the commissioned system matches the design intent. The exact commissioning checklist should follow the selected product documentation and project scope.

08Does Fujitronix support installation and after-sales service for 20 kva online ups?

Yes. Fujitronix offers consultation, installation, operator training, maintenance, battery replacement, upgrades, emergency support, and comprehensive or non-comprehensive AMC options. Final coverage, response and inclusions depend on the product, site and agreed commercial scope.

Need help choosing?

Share the load and site details. We’ll help you shortlist the right system.

WhatsAppCall